Here is a sample of over 400 new, planned, ongoing pipeline construction projects
Owner: | East African Crude Oil Pipeline Company |
Project: | East African Crude Oil Pipeline (EACOP) |
Type: | TotalEnergies in discussions with a Chinese company after Russian supplier Chelpipe was hit by sanctions. |
Length: | 902 miles (1,443 km) |
Capacity: | 200,000 b/d |
Start: | 2022 |
Completion: | 2025 |
Owner: | National Fuel Gas Supply Corp. |
Project: | Northern Access Project |
Type: | FERC approved NFG’s request for a 35-month extension to build the project by end-2024. |
Length: | 97 miles (155 km) |
Capacity: | 490 mmcf/d |
Start: | 2022 |
Completion: | 2024 |
For more information, please see Global Energy Infrastructure.
According to Pipeline & Gas Journal’s recent construction report a total figure of 19,832 miles of pipeline either planned or under construction in North America.
Morocco has re-affirmed its commitment to the construction of a new gas pipeline network along the West Africa coastline to promote intra-Africa natural gas trade, as well as to guarantee energy supplies to Europe.
Bearing the responsibility of ensuring the continuous flow of energy resources through vast networks of pipelines, the custodians of pipeline integrity face an ever-present challenge: geohazards.
Leaders within the coatings industry have indicated that there are a number of innovative products and services that have been developed recently, which enhance corrosion control and provide better pipeline coatings.
Coatings are an incredibly important part of maintaining safe pipeline operations and asset integrity, including being a first line of defense against corrosion and corrosion-induced failures.
Copyright © 2021. All market data is provided by Barchart Solutions. Futures: at least a 10 minute delay. Information is provided 'as is' and solely for informational purposes, not for trading purposes or advice. To see all exchange delays and terms of use, please see disclaimer.
Chris Womack
Southern Company appointed Chris Womack as president and CEO, replacing Thomas A. Fanning, who remains with the company as chairman of the board. Womack joined the company in 1988 as a governmental affairs representative for Alabama Power.
Gemma Neal
ICR Integrity named Gemma Neal as head of Marketing and Communications. She has more than 18 years of marketing and communications experience across energy and other sectors.
Harvest Midstream to Acquire Paradigm Midstream
Harvest Midstream agreed to buy Paradigm Midstream, LLC, from Ares Management in a move that Harvest CEO Jason Rebrook said will extend its footprint in the Eagle Ford and expand its presence into North Dakota’s Bakken.
Creative Composites Buys Enduro Composites
Fiber reinforced polymer (FRP) composites manufacturer Creative Composites Group acquired Houston-based FRP manufacturer Enduro Composites. Enduro Composites will provide installation, repair and aftermarket support in the Western and Southwestern United States.
Association for Materials Protection and Performance (AMPP)
The Association for Materials Protection and Performance (AMPP) has promoted Tim Gonzalez to director of the association’s new Corporate Outreach and Advocacy Program.
INEOS said its bio-based high-density polyethylene (HDPE) has been used to create a fully sustainable gas pipeline. Installed by French gas utility op..
Accurate, real-time data is essential to succeeding in the oil and gas industry. Engineers need operational data from the field to calibrate equipment..
FERC approves MVP’s Southgate gas pipeline extension; Regulator clears Trans Mountain, completion back on; Santos’ subsea pipeline clears construction..
East African Crude Pipeline delivers first shipment; Pembina acquires Enbridge’s stake in Alliance Pipeline; KM boosts Permian Highway pipeline capaci..
It has been more than two years since the attack on the Nord Stream pipelines and still nobody knows for sure who were the perpetrators – or if they do, they are not saying so publicly.
- Keystone Oil Pipeline Resumes Operations After Temporary Shutdown
- Biden Administration Buys Oil for Emergency Reserve Above Target Price
- Freeport LNG Plant Runs Near Zero Consumption for Fifth Day
- Enbridge to Invest $500 Million in Pipeline Assets, Including Expansion of 850-Mile Gray Oak Pipeline
- Williams Delays Louisiana Pipeline Project Amid Dispute with Competitor Energy Transfer
- Evacuation Technologies to Reduce Methane Releases During Pigging
- Editor’s Notebook: Nord Stream’s $20 Billion Question
- Enbridge Receives Approval to Begin Service on Louisiana Venice Gas Pipeline Project
- Mexico Seizes Air Liquide's Hydrogen Plant at Pemex Refinery
- Russian LNG Unfazed By U.S. Sanctions